Take a look at this year’s highway bill, and how it affects trucking. Read the bill, and notify your congressional representative or trade organization to respond.
All 3G ELDs Do Not Comply with FMCSA Regs by 12/31/2022
Verizon is the last network to shut down their 3G network, the sunset date is December 31, 2022. The other major networks shut down their 3G earlier this year. If you have an ELD system that relies on 3G to operate, it will no longer be compliant. The carrier has 8...